Pipeline Integrity & Surface Preparation

Pipeline Hydrojetting, Pigging & Anti-Corrosion Coating

High-pressure water jetting up to 3,000 bar, intelligent pipeline pigging, chemical cleaning, and advanced 3LPE/epoxy external coating services for oil, gas, and process industries.

Speak With An Engineer

Complete Pipeline Engineering Services

End-to-end solutions engineered to eliminate flow restrictions, halt internal/external corrosion, and ensure regulatory compliance.

UHP Hydrojet Cleaning

Utilizing water pressures up to 3,000 bar (43,500 PSI) with specialized rotating nozzles to eliminate stubborn mineral scale, hard carbon, waxes, and severe fouling without chemical residues.

  • Automated 2D & 3D nozzle positioning
  • Heat exchanger tube bundle jetting
  • Zero pipe wall metal loss guarantee
  • Environmentally safe fluid containment

3LPE & Epoxy Coating

Factory and field application of 3-Layer Polyethylene (3LPE), Fusion-Bonded Epoxy (FBE), and solvent-free polyurethane for underground and submerged pipeline corrosion defense.

  • Surface preparation to ISO 8501-1 Sa 2.5
  • Field joint induction heating & sleeving
  • Holiday spark testing for pinhole detection
  • Cathodic disbondment resistance

Mechanical Pigging Operations

Comprehensive pigging runs including foam scraping, bi-directional metal brush cleaning, gauge plate checking, and nitrogen drying for new and operational pipelines.

  • Progressive pigging for blocked lines
  • Aluminum calibration gauge plate verification
  • Pre-inspection baseline cleaning
  • Chemical batching & inhibitor injection

Chemical Decontamination

Engineered chemical circulation loops to passivate stainless steel lines, neutralize LEL gases, extract heavy iron sulfides, and remove internal organic grease.

  • H2S gas & Pyrophoric scale treatment
  • Acid pickling & passivation loops
  • Surfactant degreasing for refining units
  • Effluent neutralization & safe disposal

Hydrotesting & Dewatering

Pre-commissioning structural integrity pressure tests using calibrated deadweight testers, temperature recorders, high-volume fill pumps, and dry air dewatering.

  • ASME B31.3 / B31.8 pressure validation
  • 24-Hour continuous chart logging
  • Dew point drying down to -40°C
  • Corrosion inhibitor treated test water

Hot Tapping & Line Stopping

Under-pressure branch connections and temporary line isolation without shutting down plant operations, preserving uninterrupted flow in utility systems.

  • Hot taps from 2” to 36” diameter
  • Pressures up to 100 Bar / 260°C temp
  • In-service split tee welding
  • Double block and bleed isolation
Structured Execution Standard

Our Field Execution Process

Every pipeline assignment follows strict HSE, quality, and engineering controls from assessment to sign-off.

01

Diagnostic & Survey

Borescope visual inspection, ultrasonic wall thickness measurement, and fluid deposit sampling to determine cleaning methodology.

02

Isolation & Setup

Mechanical blind installation, temporary launcher/receiver rigging, and environmental containment bunding.

03

Execution Run

Controlled UHP hydrojetting, pig launching, or 3LPE surface blast & coat operations under continuous parameter monitoring.

04

QA/QC & Sign-off

Hydrostatic pressure validation, holiday testing, surface cleanliness verification, and handover documentation dossier.

Engineering Standards & Equipment Specs

Full compliance with international codes for petroleum, gas, and power infrastructure.

Third-Party Verified
Service Domain Operational Limits Applicable Standards Inspection / Deliverable
UHP Water Jetting 500 to 3,000 Bar (Flow 20-150 L/min) NACE No. 5 / SSPC-SP 12 (WJ-1 Cleanliness) Post-clean Video Borescope & Profile Log
3LPE Pipe Coating Thickness: 1.8mm – 3.5mm (Temp: -40°C to +85°C) DIN 30670 / ISO 21809-1 / CAN/CSA Z245.21 Peel Strength & 15kV Holiday Spark Report
Mechanical Pigging Pipes 2” to 48” (Length up to 120km single run) API 1104 / ASME B31.4 & B31.8 Gauging Plate Geometry Audit Certificate
Hydrostatic Testing Up to 700 Bar (Water batch capacity 500m³/hr) ASME Sec VIII / ASME B31.3 / ISO 13623 24-Hr Calibrated Pressure & Temp Chart
In-Service Hot Tapping Sizes 2” to 36” (Up to ANSI Class 600 rating) API RP 2201 / ASME Sec IX Welding Weld NDT (UT/MT) & Coupon Recovery Report

Proven Execution Track Record

A snapshot of complex pipeline interventions completed safely under tight turnaround schedules.

Fertilizer Sector

18” Cooling Water Main De-Scaling

Executed 2,200 bar hydrojetting on a 1.4km underground cooling header, removing 12 tons of calcium carbonate scale and restoring 98% design flow.

Outage Duration: 48 Hours Zero LTI
Refining & Petrochemical

3LPE Field Joint Coating Project

Applied 3LPE heat shrinkable sleeves on 420 field welds of a 24” crude oil pipeline with 100% holiday testing clearance prior to backfilling.

Total Welds: 420 Joints ISO Compliant
Gas Transmission

30” High-Pressure Line Dewatering

Conducted hydrotesting followed by foam pigging and dry air flushing to achieve a certified dew point of -42°C across a 45km natural gas trunkline.

Test Pressure: 115 Bar Passed First Run

Pipeline Services FAQ

Answers to common technical queries regarding our specialized interventions.

Does 3,000 bar hydrojetting cause internal pipe erosion or damage?

No. Water jetting relies on kinetic shear force to fracture scales rather than abrasive impact. Since water is softer than steel wall material, it cleans down to bare metal without causing metal thinning or surface pitting.

Can you pig pipelines with reduced-port valves or miter bends?

Yes. We utilize specialized ultra-flexible foam pigs and multi-diameter bi-di pigs engineered specifically for unpigged lines containing short-radius bends (1.5D) and restrictions.

What surface preparation standard is required before 3LPE field joint wrapping?

We perform grit blasting to achieve ISO 8501-1 Sa 2.5 cleanliness with an anchor profile of 50–90 microns, followed by pre-heating via induction coils to ensure 100% epoxy primer cross-linking.

Ready to Restore Flow Capacity & Protect Pipeline Integrity?

Contact our engineering team today to schedule an on-site technical inspection or request a detailed execution scope.